HYDROTEST after steam blows.
2010-12-24
We have performed a complete hydrotest of the boiler before the steam
blows. After this phase, we have to cut the steam pipes (3 pressure
level boiler) to install and weld the flow nozzles. Unlike most of our
previous projects, the nozzles are installed upstream the code stop
valve (boiler external piping).
Up to now, our standard practise is to weld and perform 100% Xrays.
Now
it seems that according to ASME B31.1 (